Auk oilfield
Location of Auk oilfield
Country United Kingdom
Location North Sea
Block(s) 30/16
Offshore/onshore offshore
Coordinates

56°24′00″N 02°04′00″E / 56.4°N 2.0666667°E / 56.4; 2.0666667Coordinates: 56°24′00″N 02°04′00″E / 56.4°N 2.0666667°E / 56.4; 2.0666667{{#coordinates:56|24|00|N|02|04|00|E|type:landmark_region:GB |primary |name=

}}
Operator(s) Talisman Energy
Field history
Start of production 1975
Production
Estimated oil in place 88.5 million barrels (~Expression error: Unexpected < operator.Expression error: Unexpected < operator.Expression error: Unexpected < operator.Expression error: Unexpected < operator.Expression error: Unexpected < operator.Expression error: Unexpected < operator.Expression error: Unexpected < operator.Expression error: Unexpected < operator.Expression error: Unexpected < operator.Expression error: Unexpected < operator.Expression error: Unexpected < operator.Expression error: Unexpected < operator.Expression error: Unexpected < operator.Expression error: Unexpected < operator.×10^Expression error: Unexpected < operator. t)

The Auk Oilfield is situated 249 kilometres (155 mi) east, southeast of Aberdeen, Scotland, in block number 30/16. It was operated by Royal Dutch Shell until October 2006 when it was bought by Talisman Energy, and is now licensed by Talisman Energy. It was discovered in February 1971 in a water depth of 82 metres. Estimated ultimate recovery is 88.5 million barrels (14.07×10^6 m3) of oil.

The field is named after the Auk a family of sea birds. There is a legend that it was to be called A UK, as the first British oilfield, until somebody realised that the sixth field would be called F UK and Shell's policy was rapidly changed to name their fields after sea birds. Shells sixth UK oilfield is called Fulmar.

The oil reservoir is located at a depth of 2,316 metres (7,598 ft).

Production started in December 1975 from the Auk 'A' platform. This platform is a steel, 8 legged jacket designed by Shell Oil and constructed at Methil, Fife, Scotland. This jacket weighs 3,414 tonnes and support a topside weight of around 8,000 tonnes.

The topsides facilities included capability to drill, produce meter and pump oil. Initially production was to an ELSBM and then to the Fulmar Alpha platform in August 1986.

Associated gas from the reservoir was separated and used to power electrical generation with the excess being flared.

See also