Cementing Equipment includes various items used while drilling oil/gas/water wells.

Casing will be installed at various depths while drilling. It is held in place by cement, which also provides zone isolation. Down-hole equipment such as Centralizers and Turbolizers is used to ensure obtaining satisfactory zone isolation. Float Shoes and Collars (float valves) prevent backflow after the cement has been pumped into place.

Centralizers, Turbolizers and Scratchers

Devices fitted with hinged collars and bow springs help keep the casing or liner in the center of the wellbore to help ensure efficient placement of a cement sheath around the casing string. If casing strings are cemented off-center, there is a high risk that a channel of drilling fluid or contaminated cement will be left where the casing contacts the formation, creating an imperfect seal.[1]

Turbolizers have added fins to "stir" up the drilling fluid and cement to keep the flow turbulent in order to make sure the cement flows all the way around the casing in order to prevent channeling.

Scratchers use metal wires to scrape mud cake off permeable zones to help obtain a solid cement column.

Float Shoe

A rounded profile float shoe with an integral check valve attached to the bottom of a casing string prevents reverse flow, or U-tubing, of cement slurry from the annulus into the casing or flow of wellbore fluids into the casing string as it is run. The float shoe also guides the casing toward the center of the hole to minimize hitting rock ledges or washouts as the casing is run into the wellbore. By "floating" casing in, hook weight is reduced. With controlled or partial fill-up as the string is run, the casing string can be floated into position, precluding the need for the rig to carry the entire weight of the casing string. The outer portions of the float shoe are made of steel and generally match the casing size and threads, although not necessarily the casing grade. The inside (including the external taper) is usually made of cement or thermoplastic, since this material must be drilled out if the well is to be deepened beyond the casing point. [2]

Guide shoes are a variant of a float shoe without a check valve.

Float Collar

A float collar is installed near the bottom of the casing string. Cement plugs land on it during the primary cementing operation, thus retaining inside the casing a small portion of the cement slurry that may have become contaminated as the top plug scrapes the inside of the casing. It is similar to a float shoe; often both are used for redundancy. The internal check valves may be flapper type or spring-loaded balls.

The check-valve assembly fixed within the float collar prevents flow back of the cement slurry when pumping is stopped. Without a float collar or float shoe, the cement slurry placed in the annulus could U-tube, or reverse flow back into the casing. The greater density of cement slurries than the displacement mud inside the casing causes the U-tube effect.[3]

Stage Collar

Stage Collars provide a means for cement slurry to be displaced higher in the annulus immediately following the primary cement job. A series of differently sized rubber plugs pumped down inside the casing open and then later close the sliding valves.

References

  1. http://www.glossary.oilfield.slb.com/Display.cfm?Term=centralizer
  2. http://www.glossary.oilfield.slb.com/Display.cfm?Term=float%20shoe
  3. http://www.glossary.oilfield.slb.com/Display.cfm?Term=float%20collar