Heerema Marine Contractors (HMC) is a contractor most notable for operation of three of the largest crane vessels in the offshore industry.[1]

History

Heerema Marine Contractors was formed in 1948 as a small construction company providing oilfield platforms in Venezuela.

In the 1960s the company focused on the North Sea offshore developments. The company developed crane vessels to lift large offshore platforms and modules. The ship shaped crane vessel Challenger was equipped to lift 800 t.[2]

The need for large stable crane vessels to operate in the North Sea environment lead the company to develop the first large semi-submersible crane vessels. In 1978, HMC commissioned Mitsui to construct the two sister semi-submersible crane vessels, DCV Balder and DCV Hermod. These vessel could lift 5,400 tonnes with the twin cranes, and were later upgraded to 8,200 tonnes.[2]

In 1988 HMC formed a joint venture with McDermott called HeereMac.[3]

The SSCV Thialf was added to the Heeremac fleet, and upon the split of the companies in December 1997, Heerema took ownership of the Thialf, the largest deep water construction vessel.

The DCV Balder was affected by a flooding incident in 2006 and was put out of service for a few months.[4]

Vessels

Heerema presently owns and operates the following crane vessels:

Plus a number of barges

DCV Aegir is in construction and expected to complete trial in 2013.

Significant installations

References