Profile

Onshore apllication : PTH was installed in oil production wells to protect the Piston pumps from damage caused by scale and deposits, and to prolong production lifespan. The normal cycle of maintenance had been to remove and replace the piston pump every 2 weeks. After installing the PTH, the maintenance cycle has now been extended to 24 weeks.

Address

15 Shnitzler st.
Tel Aviv,
Israel

External Link

Hop - PTH